In this application an exterior specific environmental t-bar grid system was suspended and anchored to the concrete structured ped-way, connecting the hotels lobby to the mall parkade. SAGIREV REF # 4 Espresso Blackwood 6″ panels were then fastened to the face of the grid and finished with J mold along the perimeter and an H mold along four continuous seams.